Kronoterm templates with product references such as TMP_E1, TMP_E2Z, etc. are used as installation templates for preparing the placement of hydraulic and electrical pipes in walls before installing an ETERA heat pump or a HYDRO B(A) boiler. They are supplied as standard with each ETERA or HYDRO(B) unit, but can be ordered separately for preparation of the installation.
Brand
KRONOTERM
Application
The templates are placed on the wall where the ETERA or HYDRO B(A) unit will be installed.
They indicate the exact positions for drilling and laying hydraulic pipes (supply, return), condensate drain and electrical wiring (power, communication).
This simplifies the preparatory work for installers before the actual installation of the heat pump.
Characteristics
Sturdy cardboard template
Dimensions on a scale of 1:1 correspond exactly to the wall mounting dimensions of the ETERA or HYDRO B(A)
Clear markings for drill holes, pipe feed-throughs and cable feed-throughs
Characteristic TMP code (e.g. TMP_E1, TMP_E2Z) is tailored to a specific model or installation variant
Time saving: Speeds up and simplifies installation preparation considerably
Error prevention: Prevents incorrect placement of connections
Versions
TMP_E1 Template for ETERA connection preparation, scale 1:1
TMP_E1Z Template for ETERA connection preparation, scale 1:1, with buffer tank ZA_P 40 ETERA
TMP_E2 Template for MODUL_PIL ETERA connection preparation, scale 1:1
TMP_E2Z Template for MODUL_PIL ETERA connection preparation, scale 1:1, with buffer tank ZA_P 40 ETERA
TMP_E3 Template for MODUL_PASIVA ETERA connection preparation, scale 1:1
TMP_E3Z Template for MODUL_PASIVA ETERA connection preparation, scale 1:1, with buffer tank ZA_P 40 ETERA
TMP_E4 Template for MODUL_PIL-PASIVA ETERA connection preparation, scale 1:1
TMP_E4Z Template for the MODUL_PIL-PASIVA ETERA connection preparation, scale 1:1, with buffer tank ZA_P 40 ETERA
TMP_B1 Template for the preparation of the HYDRO B connection, scale 1:1
TMP_B1Z Template for the HYDRO B connection preparation, scale 1:1, with buffer tank ZA_P 40 ETERA
TMP_BA Template for the preparation of the HYDRO BA connection, scale 1:1
Order example
TMP_E1
Explanation
TMP_E1
Template for the preparation of the hydraulic pipes and electrical lines of the ETERA, scale 1:1