PRODUCTS
EShop-number
Password
Welcome to CAIROX BELGIUM

TMP_ETERA_HYDRO • Templates for ETERA and HYDRO B(A)

  • Geothermal heat pump
  • KRONOTERM
  • Preparation of pipes in wall for ETERA or HYDRO B(A) installation

Kronoterm templates with product references such as TMP_E1, TMP_E2Z, etc. are used as installation templates for preparing the placement of hydraulic and electrical pipes in walls before installing an ETERA heat pump or a HYDRO B(A) boiler. They are supplied as standard with each ETERA or HYDRO(B) unit, but can be ordered separately for preparation of the installation.

Brand

  • KRONOTERM

Application

  • The templates are placed on the wall where the ETERA or HYDRO B(A) unit will be installed.
  • They indicate the exact positions for drilling and laying hydraulic pipes (supply, return), condensate drain and electrical wiring (power, communication).
  • This simplifies the preparatory work for installers before the actual installation of the heat pump.

Characteristics

  • Sturdy cardboard template
  • Dimensions on a scale of 1:1 correspond exactly to the wall mounting dimensions of the ETERA or HYDRO B(A)
  • Clear markings for drill holes, pipe feed-throughs and cable feed-throughs
  • Characteristic TMP code (e.g. TMP_E1, TMP_E2Z) is tailored to a specific model or installation variant
  • Time saving: Speeds up and simplifies installation preparation considerably
  • Error prevention: Prevents incorrect placement of connections

Versions

  • TMP_E1 Template for ETERA connection preparation, scale 1:1
  • TMP_E1Z Template for ETERA connection preparation, scale 1:1, with buffer tank ZA_P 40 ETERA
  • TMP_E2 Template for MODUL_PIL ETERA connection preparation, scale 1:1
  • TMP_E2Z Template for MODUL_PIL ETERA connection preparation, scale 1:1, with buffer tank ZA_P 40 ETERA
  • TMP_E3 Template for MODUL_PASIVA ETERA connection preparation, scale 1:1
  • TMP_E3Z Template for MODUL_PASIVA ETERA connection preparation, scale 1:1, with buffer tank ZA_P 40 ETERA
  • TMP_E4 Template for MODUL_PIL-PASIVA ETERA connection preparation, scale 1:1
  • TMP_E4Z Template for the MODUL_PIL-PASIVA ETERA connection preparation, scale 1:1, with buffer tank ZA_P 40 ETERA
  • TMP_B1 Template for the preparation of the HYDRO B connection, scale 1:1
  • TMP_B1Z Template for the HYDRO B connection preparation, scale 1:1, with buffer tank ZA_P 40 ETERA
  • TMP_BA Template for the preparation of the HYDRO BA connection, scale 1:1

Order example

  • TMP_E1
Explanation
TMP_E1
Template for the preparation of the hydraulic pipes and electrical lines of the ETERA, scale 1:1
HELPCopyrightSales conditionsCookie policyAirvance Group

Requesting information. Please wait a moment...